Tuesday, September 7, 2010

Tying Up Loose Ends

The time is growing short for the summer house stay, so tying up loose ends is very much on the agenda for the coming weeks. Always, always, there are UFO's brought from the main house with thoughts that those little projects can be completed in the summer--NOT! But, Finally this past week, there was the push to tidy up and get those things out of the UFO pile. There were the two caps half knitted--yes, half finished! So, it didn't take much time to whip them off the needles. The top one is all hand spun.
This hat was from all those loose sock yarns.
These are charity hats for Knits for Needs . Since it was hot weather, there was no desire to knit on wool hats, but sure feels good to add them to finished projects. And this project has been ongoing since early in the year. It's from Fat Cat Patterns. It was easy to manage one or two blocks a month on this project. Sindy is repeating the BOM for this Christmas quilt so hop over to her website and catch up. She has also begun one for Halloween that will complete next spring. This quilt is going to the hands of long arm quilter--she'll have fun designing for this! Okay, off to finish up at least one more UFO from the summer stockpile.

1 comment:

  1. Great job with the hats!I love the winter quilt. I need to check out some of your BOM groups.

    ReplyDelete

Surface Design Issues

There is a box filled with surface designed fabrics—these fabrics date several years—well aged now.  I have been using some of the fabrics f...